ABB IRB 8700 Product Manual page 256

Hide thumbs Also See for IRB 8700:
Table of Contents

Advertisement

4 Repair
4.5.1 Replacing the upper arm
Continued
5
6
Removing the cable harness in the upper arm
1
2
3
Continues on next page
256
Action
Remove the cable gland cover.
Make sure the gasket is not damaged.
Tip
Make a note in which direction the cable
gland hole is facing, if the motor will be re-
moved too. The motor shall be refitted in
the same position.
Use caution and pull out the motor cables.
Action
DANGER
Make sure that all supplies for electrical
power, hydraulic pressure, and air pressure
are turned off.
Remove the cable clamp on the axis-3
bracket, between axis-4 motor and arm
housing.
Unscrew the screw that holds the cable
clamp at the end of the axis-3 bracket.
© Copyright 2015-2020 ABB. All rights reserved.
Note
xx1200001067
Note
xx1500003092
xx1500002718
Product manual - IRB 8700
3HAC052853-001 Revision: M

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 8700 - 550/4.20Irb 8700 - 800/3.50

Table of Contents