ABB IRB 8700 Product Manual page 607

Hide thumbs Also See for IRB 8700:
Table of Contents

Advertisement

4
5
Performing a leak-down test
1
Preparations before refitting the motor
1
2
3
4
Product manual - IRB 8700
3HAC052853-001 Revision: M
Action
Remove the hub tool and fit the attachment
screws for the hub.
Apply locking liquid (Loctite 243) on the
screws.
Note
The number of attachment screws differ
depending on gearbox.
Secure the hub.
Action
Perform a leak-down test.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove old paint residues and other contamina-
tion from the contact surfaces on both motor and
gearbox.
Wipe clean the contact surfaces from any remain-
ing contamination.
Also wipe clean the o-ring groove.
Inspect the o-ring.
Note
Replace if damaged.
© Copyright 2015-2020 ABB. All rights reserved.
4.8.3 Replacing the axis-2 gearbox
Note
Attachment screws: M6x30 12.9.
Loctite 243
Quantity:
Axis-1 = 6 pcs
Axis-2 = 8 pcs
Axis-3 = 8 pcs
Axis-4 = 4 pcs
Axis-5 = 6 pcs
Axis-6 = 4 pcs
Tightening torque: 14 Nm.
Note
See
Performing a leak-down test on
page
178.
Note
O-ring, 3HAB3772-107
xx1200001019
Continues on next page
4 Repair
Continued
607

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 8700 - 550/4.20Irb 8700 - 800/3.50

Table of Contents