Lifting the complete robot onto the supporting pillars
1
2
3
4
5
6
Disconnecting the cable harness in the base
1
Product manual - IRB 8700
3HAC052853-001 Revision: M
Action
CAUTION
Make sure that the robot is secured in the
lifting accessories.
Unscrew the attachment screws that secure
the robot to the foundation.
Use caution and lift the complete robot up,
high enough to be able to attach the sup-
porting pillars to the foundation.
Fit the supporting pillars to the foundation
with the enclosed attachment screws.
Use caution and lower the robot slowly
down onto the supporting pillars, making
sure the holes in robot base will match the
holes in the pillars.
Secure the base to the supporting pillars
with the robot attachment screws.
Action
DANGER
Make sure that all supplies for electrical
power, hydraulic pressure, and air pressure
are turned off.
© Copyright 2015-2020 ABB. All rights reserved.
4.8.2 Replacing the axis-1 gearbox
Note
Supporting pillars: 3HAC061213-001
Follow user instructions enclosed with the
pillars.
Tightening torque: 325 Nm
Follow user instructions enclosed with the
pillars.
Tightening torque: 325 Nm
xx1700000928
Note
Continues on next page
4 Repair
Continued
541