If a new folder is needed, go to step 3, else go to next section.
3
Highlight desired main folder. Press the soft key Create Directory to create a
sub-directory.
A virtual keyboard will appear to allow you to input a new folder name. Alterna-
tively, you can connect a USB keyboard to input the name.
NOTE
You must name the folder after your site name (ex: Jones, MSC, Valley View,
etc).
4
Once the folder name is input, press Enter to validate and create.
5
All test files will be saved into this directory, unless a new one is created or the
selection of the target directory changes.
NOTE
It is not mandatory to create a subdirectory as the script automatically cre-
ates one at the start of the test sequence.

Setting the test parameters

Setting the Fiber Complete (FCOMP) test parameters on
both units
1
Go to the FCOMP tab
2
Press the S
3
Configure the FCOMP Setup parameters as below:
Figure 237
FiberComplete setup
Fiber Characterization Test Sequence in Manual mode
key to get access to the setup menu
ETUP
User Manual
Chapter 17 Fiber Characterization
78000010220 Rev. 024
475