Performing The Measurement; Performing An Acquisition From Results Page - Viavi 8100 V2 Series User Manual

Portable, modular platform designed for the construction, validation and maintenance of optical fiber networks
Hide thumbs Also See for 8100 V2 Series:
Table of Contents

Advertisement

Performing the measurement

Once the measurement is correctly configured, the acquisition can be performed.
1
Press S
The red Testing indicator goes on to show that the Platform 8000 is in process of
acquisition and the screen displays the trace in process of acquisition.
2
The quality of the connection is displayed for a few
seconds (see
3
Then, a bar graph shows elapsed and remaining acquisition time.
Figure 103
Acquisition in progress in RDZ mode
At the end of the acquisition, a beep is emitted, and the measurements are displayed.

Performing an acquisition from Results page

Once the results page is displayed, you can perform a new acquisition modifying the
main acquisition parameters.
CAUTION
Before launching a new OTDR acquisition, make sure the trace(s) dis-
played have been previously saved if necessary, as the new acquisi-
tion will automatically delete the displayed results.
S
button on the T-BERD/MTS to launch the acquisition.
TART
TOP
Table 3 on page
Elapsed
Number of
acquisition
averages
time
calculated
User Manual
Chapter 4 Reduced Dead Zone OTDR application
56)
Elapsed
Total acquisition
time
time
78000010220 Rev. 024
Performing the measurement
171

Advertisement

Table of Contents
loading

Table of Contents