NOTE
During acquisition, the traffic on fiber is automatically detected (see
Detection" on page
Stopping the real time acquisition
To stop an acquisition in real time mode, press the S
Performing a measurement with Smart Test
The acquisition is carried out with the parameters saved in the Configuration file. It may
be stopped at any time using the S
At the end of test, the results page displays.
1
From the Setup page, press Start Acquisition key
measurement (see
The red Testing indicator goes on to show that the T-BERD/MTS is in process of
acquisition and the screen displays the trace in process of acquisition.
2
The quality of the connection is displayed for a few
seconds (see
3
Then, a bar graph shows elapsed and remaining acquisition time.
Figure 30
Acquisition in progress in Smart Test
56)
Figure 17 on page
Table 3 on page
Elapsed
Number of
acquisition
averages
time
calculated
User Manual
Chapter 3 Reflectometry measurements
TART
/S
key.
TART
TOP
30).
56)
Elapsed
Total acquisition
time
time
78000010220 Rev. 024
Performing OTDR acquisitions
/S
key at any time.
TOP
to launch
"Traffic
59