Launching The Acquisition - Viavi 8100 V2 Series User Manual

Portable, modular platform designed for the construction, validation and maintenance of optical fiber networks
Hide thumbs Also See for 8100 V2 Series:
Table of Contents

Advertisement

File + pdf
Auto store
Select Yes to store automatically the trace or traces resulting from each acquisition
according to the filenaming rules.

Launching the acquisition

CAUTION
Inspect & clean all fiber connections prior connecting fiber cables into the
ports.
1
Press S
The red Testing indicator goes on to show that the T-BERD/MTS is in process of
acquisition and the screen displays the trace in process of acquisition.
2
The quality of the connection is displayed for a few
seconds (see
3
Then, a bar graph shows elapsed and remaining acquisition time.
Figure 84
Acquisition in progress
At the end of the acquisition, a beep is emitted, the trace is displayed and an
automatic measurement is started.
the trace(s) is/are stored in one/several file(s), with its extension and
one pdf file is also generated.
/S
hard key to launch measurement.
TART
TOP
Table 3 on page
Elapsed
Number of
acquisition
averages
time
calculated
User Manual
Chapter 3 Reflectometry measurements
56)
Total
Elapsed
acquisition
time
time
78000010220 Rev. 024
FTTH-SLM Software option
149

Advertisement

Table of Contents
loading

Table of Contents