Figure 123
Acceptance Test

Activating the function

1
Press the H
2
Use direction key
3
Press E
The icon turns yellow and Fiber Complete is displayed

Establishing References

To get a meaningful measurement, the two leads or patch cords used for the measure-
ment have to be referenced.
The references are valid for all fibers that will be tested during the day with the same
patch cords, not disconnected from the source. If, at anytime, the patchcords are discon-
Reference Source and power meter on
Units A & B
Setup Units A & B
(Measurement and File parameters)
S
/S
Press
TART
TOP
measurements
Measure loss A->B, B->A, and Avg and
store/display on both units
Measure ORL A & ORL B, and
store/display on both units
Compare results with defined thresholds
Fail
Fault finder
button.
OME
to reach the icon FCOMP.
key to activate the function.
NTER
User Manual
Chapter 7 FiberComplete Modules
button to launch the
Pass
78000010220 Rev. 024
Activating the function