Figure 180
Zero reference screen
Performing an In-Band PMD-OSNR measurement
with an I-PMD Module
Installation
Once I-PMD setup has been correctly configured:
1
Connect a jumper between the I-PMD module and the PSM output port.
2
Connect the fiber to be tested to the PSM input port.
Performing an In-Band PMD-OSNR measurement with an I-PMD Module
User Manual
Chapter 11 I-PMD Measurement
78000010220 Rev. 024
365