ABB IRB 1100 Product Manual page 305

Hide thumbs Also See for IRB 1100:
Table of Contents

Advertisement

5
6
7
Removing the axis-1 timing belt
1
Product manual - IRB 1100
3HAC064992-001 Revision: L
Action
Remove the screws and washers.
Carefully lift out the motor.
CAUTION
A cooling pad is attached to the motor, which may
stick to the casting. Always use a plastic sheet
with caution to remove the pad from the casting.
Pay attention not to scratch the casting or damage
the pad.
Remove the timing belt from its groove on the
motor.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
© Copyright 2019-2022 ABB. All rights reserved.
5 Repair
5.4.2 Replacing the swing
Continued
Note
xx1800003065
Cooling pad location
xx1800003602
xx1800003066
Note
Continues on next page
305

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents