ABB IRB 1100 Product Manual page 395

Hide thumbs Also See for IRB 1100:
Table of Contents

Advertisement

5
6
7
Loosening the cable package from axis-4 gearbox
1
2
Product manual - IRB 1100
3HAC064992-001 Revision: L
Action
Remove the screws and washers.
Carefully lift out the motor.
Remove the timing belt from its groove on the
motor.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
123.
© Copyright 2019-2022 ABB. All rights reserved.
5 Repair
5.6.1 Replacing the housing
Continued
Note
xx1800002996
xx1800002997
Note
Continues on next page
395

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents