5 Repair
5.3.1 Replacing the upper cable package
Continued
13
14
Reconnecting the connectors at the division point
1
2
Continues on next page
174
Action
Remove the adjustment screw from the motor.
Reconnect the connector.
•
MP2
Tip
See the number markings on the connectors for
help to find the corresponding connector.
Action
For robots with protection type Clean Room:
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
Insert the female header of the connectors to the
connector plate.
© Copyright 2019-2022 ABB. All rights reserved.
Note
xx1900000010
xx1800002495
Note
xx1800003029
Product manual - IRB 1100
3HAC064992-001 Revision: L