ABB IRB 1100 Product Manual page 303

Hide thumbs Also See for IRB 1100:
Table of Contents

Advertisement

Pulling out the cable package
1
2
3
4
5
Product manual - IRB 1100
3HAC064992-001 Revision: L
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
replacing parts on page
123.
Pull out the lower cable package from the axis-1
gearbox.
Pull out the lower cable package from the base.
Remove the pulley cover from the lower cable
package.
© Copyright 2019-2022 ABB. All rights reserved.
5 Repair
5.4.2 Replacing the swing
Continued
Note
xx1800003044
xx1800003045
xx1800003046
Continues on next page
303

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents