Stby +5Vdc Power Rap; +5Vdc Power Rap - Xerox workcentre 5335 series Service Manual

Table of Contents

Advertisement

STBY +5VDC Power RAP

BSD-ON:
BSD 1.2 - Main Power on (2 of 2)
BSD-ON:
BSD 1.4 - DC Power Generation (1 of 2)
NOTE: When turning the power OFF; first, turn OFF the Power Switch, then the Main Power
Switch.
Procedure
Turn the Main Power Switch ON, then turn the Power Switch ON. +5VDC is measured at the
Main LVPS between
P/J501
pins 7, 8, 9, and 10 (+); and GND (-)
Generation (1 of
2)).
Y
N
AC line voltage is measured at the Main LVPS between
1.2 - Main Power on (2 of
2)).
Y
N
Go to
AC Power
RAP.
Turn the power OFF and disconnect
wait 15seconds. +5VDC is measured at the Main LVPS between
and 10 (+); and GND (-).
Y
N
Replace the Main LVPS
(PL
18.2).
Check the +5VDC circuit for a short circuit to frame by referring to Chapter 7 Wiring Data.
Check the wire to the applicable component for an open circuit or poor contact by referring to
Chapter 7 Wiring Data.
Status Indicator RAPs
STBY +5VDC Power RAP, +5VDC Power RAP
(BSD 1.4 - DC Power
P/J1
pin 1 and pin 3
P/J501
on the Main LVPS. Turn ON machine power,
P/J501
pins 7, 8, 9,
BUS Updated 12/2011

+5VDC Power RAP

BSD-ON:
BSD 1.2 - Main Power on (2 of 2)
BSD-ON:
BSD 1.3 - LVPS Control
BSD-ON:
BSD 1.4 - DC Power Generation (1 of 2)
BSD-ON:
BSD 1.7 - DC Power Distribution (options)
BSD-ON:
BSD 1.9 - Power Interlock Switching (2 of 2)
NOTE: When turning the power OFF; first, turn OFF the Power Switch, then the Main Power
Switch.
(BSD
When measuring the voltage (+5VDC), turn ON the power then measure it before the machine
goes into the Power Save mode.
Procedure
Turn the power ON; turn ON the Main Power Switch, then turn ON the Power Switch.
+5VDC is measured at the Main LVPS between
(BSD 1.7 - DC Power Distribution
Y
N
AC line voltage is measured at the Main LVPS between
1.2 - Main Power on (2 of
Y
N
Go to
AC Power
RAP.
Turn the power OFF and disconnect the Main LVPS connectors P/J502, P/J503, and
J506. Turn ON machine power, wait 15 seconds. +5VDC is measured at the Main LVPS
between
P/J502
pin 3 and pin 5 (+), and GND (-)
(options)).
Y
N
The STBY +5VDC LED, Green, on the ESS PWB is lit
Y
N
Ensure that
properly seated and that the Wire Harness is not damaged
Power Generation (1 of
If the checks are OK, go to
The +24VDC LED, Orange, on the ESS PWB is lit
Y
N
Check in the following order:
Ensure that
properly seated, and that the Wire Harness is not damaged
Power Generation (1 of
Refer to
(BSD 1.3 - LVPS
Main LVPS.
Replace the Main LVPS
Replace the Main LVPS
A
B
07/2011
2-1016
P/J501
pin 3 and pin 5 (+), and GND (-)
(options).
P/J1
pin 1 and pin 3
2)).
(BSD 1.7 - DC Power Distribution
(Figure
P/J501
on the Main LVPS and
P/J300
on the ESS PWB are
2)).
STBY +5VDC Power
RAP.
(Figure
1).
P/J501
on the Main LVPS and
P/J300
on the ESS PWB are
2)).
Control) and check the 5V C-F On Signal to the
(PL
18.2).
(PL
18.2).
WorkCentre 5335 Family Service Documentation
(BSD
P/
1).
(BSD 1.4 - DC
(BSD 1.4 - DC
Initial Issue

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workcentre 5335 series

Table of Contents