Xerox workcentre 5335 series Service Manual page 1073

Table of Contents

Advertisement

5.
Perform the following
(Figure
4).
a.
Remove the MCU PWB chassis Screws (7).
b.
Move the MCU PWB chassis to the left.
Figure 4 Removing Screws
Repairs & Adjustments
REP 4.1
a
BUS Updated 12/2011
Be careful not to damage any components on the motor PWB's when removing or replacing
the Main Drive.
6.
Remove the Main Drive
(Figure
a.
Remove the Screws (4).
b.
Lift the unit up to remove the drive belt from the pulley, then remove the Main Drive.
Figure 5 Removing Screws
Replacement
1.
To reinstall, carry out the removal steps in reverse order.
07/2011
4-12
CAUTION
5).
b
a
WorkCentre 5335 Family Service Documentation
Initial Issue

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workcentre 5335 series

Table of Contents