Avaya S8700 Maintenance Manual page 2150

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Maintenance-Object Repair Procedures
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. For example, by clearing error codes associated with the
Configuration audit (#759), you may also clear errors generated from other tests
in the testing sequence.
Order of Investigation
Configuration audit (#759)
Failure audit (#777)
Processor Route audit (#760)
SNC On-Board test (#778)
TPN test (#779)
Switch Node Clock Reset test (#780)
1.
D = Destructive, ND = Nondestructive
See
''SNC-BD (Switch Node Clock Circuit Pack)'' on page 8-1384
of tests and results.
8-1428
Issue 1 May 2002
Short Test
Long Test
Sequence
Sequence
X
X
X
X
X
X
X
X
X
Reset Board
1
Sequence
D/ND
ND
ND
ND
ND
ND
X
D
for descriptions
555-233-143

Advertisement

Table of Contents
loading

Table of Contents