Avaya S8700 Maintenance Manual page 2182

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Maintenance-Object Repair Procedures
3. Use the status sys-link command and select the active EI in the
IPSI-connected EPN connected to the distant switch node being tested.
(This display will show the path from the IPSI-connected EPN and the
SNI-to-SNI fiber being used in this path.)
4. If the port network LEDs are lit and multiple SNI-to-SNI fibers connect to
this distant switch node, physically remove the SNI that is listed in this
path.
If not lit, check that the fiber connections to the EPN are consistent with the
administered fibers (list fiber-link) that do not light the LEDs as expected.
5. Use the status sys-link command to determine the new path from the
IPSI-connected EPN to the this distant switch.
6. Run the test led port-network command on an EPN connected to the
distant switch node and verify that the LEDs on the correct EPN are lit.
7. Repeat steps 4 – 6 until the last SNI-to-SNI fiber to this distant switch node
has been tested.
Table 8-579. TEST #759 Configuration Audit
Error
Test
Code
Result
Description / Recommendation
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2300
ABORT
The downlink message necessary to run this test could not be sent.
1. Retry the command at 1-minute intervals up to 3 times.
2301
ABORT
The software timer could not be set before sending the downlink message
necessary to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
8-1460
Issue 1 May 2002
Continued on next page
555-233-143

Advertisement

Table of Contents
loading

Table of Contents