Avaya S8700 Maintenance Manual page 2178

For multi-connect configurations
Hide thumbs Also See for S8700:
Table of Contents

Advertisement

Maintenance-Object Repair Procedures
SNI Destructive Facility Test (#757)
This test is destructive.
The SNI runs a destructive loop around of the off-board and on-board loop
around. This test returns the result of the on-board loop around, while test 756
returns the result of the off-board loop around.
Table 8-578. TEST #757 SNI Destructive Facility Test
Error
Test
Code
Result
Description / Recommendation
1015
ABORT
The system will not allow this test to be run because the SNI circuit pack has
not been busied out. Busyout the SNI circuit pack with busyout board.
Repeat the test board UUCSS long command.
2100
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2300
ABORT
The downlink message necessary to run this test could not be sent.
1. Retry the command at 1-minute intervals up to 3 times.
2301
ABORT
The software timer could not be set before sending the downlink message
necessary to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2304
ABORT
SNI circuit pack responded that it is not able to run the test requested by
software.
1. Retry the command at 1-minute intervals up to 3 times.
8-1456
Issue 1 May 2002
Continued on next page
555-233-143

Advertisement

Table of Contents
loading

Table of Contents