Replacement
1.
(65-87 ppm) If installing a new firewire PWB, replace the mounting bracket with either the
mounting bracket from the old firewire PWB, or install a new a mounting bracket, PL 3.11
Item 5. Refer to Figure 2.
2.
Ensure that the EPC memory PWBs are installed into the correct connectors on the
image processing PWB. Refer to Figure 1.
3.
Connect the power cord and switch on the machine, GP 14.
Figure 2 Mounting bracket (65-87 ppm)
Repairs/Adjustments
REP 3.2
1
Remove the existing mounting
bracket (2 screws).
2
Install either the mounting bracket
from the old firewire PWB or a
new mounting bracket.
August 2007
4-34
WorkCentre 5687 Family