A
•
P/J8 and P/J4 on the inserter control PWB.
•
11A-171 HVF BM Power Distribution RAP.
Install new components as necessary:
•
PPI paper width 2 sensor, PL 11.175 Item 13.
•
Inserter control PWB, PL 11.179.
•
HVF control PWB, PL 11.157 Item 2.
Go to Flag 7 and Flag 8. Measure the voltage from the PPI acceleration sensor, while actuating
the sensor with paper. The voltage changes.
Y
N
Check the PPI acceleration sensor. Refer To:
•
GP 11 How to check a Sensor.
•
P/J11 and P/J4 on the inserter control PWB.
•
11A-171 HVF BM Power Distribution RAP.
Install new components as necessary:
•
PPI acceleration sensor, PL 11.175 Item 10.
•
Inserter control PWB, PL 11.179 Item 9.
•
HVF control PWB, PL 11.157 Item 2.
Got to Flag 9 and Flag 10. Measure the voltage from the IDG Pickup sensor while actuating the
sensor with paper. The voltage changes.
Y
N
Check the IDG Pickup sensor. Refer to:
•
GP 11 How to check a Sensor.
•
P/J7 and P/J4 on the inserter control PWB.
•
11A-171 HVF BM Power Distribution RAP.
Install new components as necessary:
•
IDG pickup sensor PL 11.179 Item 10.
•
Inserter control PWB, PL 11.179.
•
HVF control PWB, PL 11.157 Item 2.
Perform SCP 6 final actions.
WorkCentre 5687 Family
IDG Pickup
sensor
Figure 1 Component location
August 2007
2-657
PPI paper present
sensor, Q11-153
Acceleration
sensor
Status Indicator RAPs
11J-171