Toyota Celica 2005 Repair Manual page 2466

Hide thumbs Also See for Celica 2005:
Table of Contents

Advertisement

AC−42
INSTALLATION
Bolt C
Bolt A
Bolt C
2005 CELICA (RM1131U)
AIR CONDITIONING
Bolt A
Bolt B
I13000
Push
Bolt B
Bolt B
H23741
COMPRESSOR AND MAGNETIC CLUTCH
1.
INSTALL COMPRESSOR
(a)
Install the compressor with 3 bolts.
(b)
Temporarily tighten bolt A.
HINT:
Do not over tighten the bolt until the compressor no longer
moves.
(c)
Push down on the rear side of the compressor and fully
tighten bolt B, bolt C and bolt A in order.
Torque: 25 N·m (250 kgf·cm, 18 ft·lbf)
(d)
Connect the compressor connector.
2.
CONNECT DISCHARGE AND SUCTION HOSES
(a)
Lubricate 2 new O−rings with compressor oil and install
them to the hoses.
(b)
Connect the both hoses with 2 bolts.
Torque: 10 N·m (100 kgf·cm, 7 ft·lbf)
NOTICE:
Hose should be connected immediately after the caps have
been removed.
3.
1ZZ−FE:
INSTALL CRUISE CONTROL ACTUATOR (See page
CO−30)
4.
2ZZ−GE:
INSTALL AIR PUMP ASSEMBLY (See page CO−30)
5.
INSTALL AND CHECK DRIVE BELT
(See page AC−18, AC−16)
6.
CONNECT NEGATIVE (−) TERMINAL CABLE TO BAT-
TERY
7.
EVACUATE AIR FROM REFRIGERATION SYSTEM
AND CHARGE SYSTEM WITH REFRIGERANT
Specified amount: 430 ± 30 g (15.17 ± 1.06 oz.)
8.
INSPECT FOR LEAKAGE OF REFRIGERANT
(a)
Using a gas leak detector, check for leakage of refriger-
ant.
If there is leakage, check the tightening torque at the joints.
9.
INSPECT A/C OPERATION
2465
AC3SA−01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents