EXHAUST (J05E)
INSPECTION BY WAY OF HINO-DX
1.
DPR STATUS CHECK
(1)
Select the "DPR Reset confirmation" in the "Check function"
menu of HINO-DX.
(2)
Confirm Data View of the "DPR status display"display (monitor), if
the value for all the items are "OFF", DPR functions normally.
Then "Manual forced regeneration" and "DPR differential pressure
check" can be done.
(3)
In case "ON" is displayed in Data View of the "DPR status display"
display (monitor), check according to the procedure on page.
Reference: EXHAUST (J05E), DPR CLEANER, DETERMINA-
TION BY WAY OF DPR STATE DETERMINATION MONITOR
OF HINO-DX (Page 11-36)
2.
FORCED REGENERATION
(1)
Forced regeneration is done by the "Manual forced regeneration"
screen.
! CAUTION
•
Confirm safety of the surrounding area, then press DPR
regeneration switch inside the cabin to execute the regenera-
tion.
•
Confirm the PTO switch is OFF.
11–29
EN01F02127100402002005
SHTS021271000043
Need help?
Do you have a question about the S5-LJ05E04A and is the answer not in the manual?
Questions and answers