Inspection By Way Of Hino-Dx - Hino S5-LJ05E04A Workshop Manual

Table of Contents

Advertisement

EXHAUST (J05E)

INSPECTION BY WAY OF HINO-DX

1.
DPR STATUS CHECK
(1)
Select the "DPR Reset confirmation" in the "Check function"
menu of HINO-DX.
(2)
Confirm Data View of the "DPR status display"display (monitor), if
the value for all the items are "OFF", DPR functions normally.
Then "Manual forced regeneration" and "DPR differential pressure
check" can be done.
(3)
In case "ON" is displayed in Data View of the "DPR status display"
display (monitor), check according to the procedure on page.
Reference: EXHAUST (J05E), DPR CLEANER, DETERMINA-
TION BY WAY OF DPR STATE DETERMINATION MONITOR
OF HINO-DX (Page 11-36)
2.
FORCED REGENERATION
(1)
Forced regeneration is done by the "Manual forced regeneration"
screen.
! CAUTION
Confirm safety of the surrounding area, then press DPR
regeneration switch inside the cabin to execute the regenera-
tion.
Confirm the PTO switch is OFF.
11–29
EN01F02127100402002005
SHTS021271000043

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S5-LJ05E04A and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

S5-lj05e05a

Table of Contents

Save PDF