SSANGYONG Rexton Y200 Manual page 1182

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

5D1-30 PART TIME - T/C
Adapter, Input Shaft and Carrier Gear
1. Remove the breather.
2. After removing 6 bolts, remove the front adopter
by separating the adapter sealer bond from the
case using a screw driver.
Notice: Be careful not to damage the contacting
surface of the case and adapter.
3. Remove the adapter assembly, input shaft
assembly and carrier gear assembly.
4. Remove the snap ring and oil seal from the front
adapter.
5. After removing snap ring, pull out the bearing and
thrust washer from the input shaft assembly and
separate the input shaft assembly from the carrier
gear assembly.
6. Remove the needle bearing and sleeve bearing
from the input shaft assembly.
7. Remove the retaining ring, thrust plate rind sun
gear from the planet carrier assembly.
Notice: Do not disassemble the planet carrier
assembly.
YAD5D570
Transfer Case Assembly(Front)
1. Remove the oil seal.
2. Remove the retaining ring and the ball bearing.
3. Remove the pin from the transfer case.
Notice: Be careful not to give any damage to the
case for removing the pin.
4. Remove the ring gear from the case using the
press.
Notice: Replace new part for installation.
YAD5D580
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents