Action
Refit the cover plate.
Action
Refill oil to the axis-2 gearbox.
Turn on the air pressure supply to the
overpressure system.
Check the leak flow value on the flow
sensor and compare it to the initial value.
The value should be the same.
If the value is higher than the initial value,
fault trace according to
Inspecting the leak
flow (overpressure unit) in the system on
page
128.
Re-calibrate the robot.
DANGER
Make sure all safety requirements are met
when performing the first test run.
© Copyright 2019 - 2020 ABB. All rights reserved.
4.8.2 Replacing the axis-2 gearbox
Note
Attachment screws: M10x30 Stainless Steel
(3HAC060786-020) (4 pcs)
xx1300000554
Note
See
Filling oil into the axis-2 gearbox on
page
139.
xx1700001593
Axis Calibration is described in
with Axis Calibration method on page
General calibration information is included
in section
Calibration on page
4 Repair
Continued
Calibrating
623.