NTP- D24 Verify Card Installation
11.
NTP-D24 Verify Card Installation
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
Verify that two TCC2/TCC2P cards are installed in Slots 7 and 11.
Step 2
Verify that the green ACT (active) LED is illuminated on one TCC2/TCC2P card and the amber STBY
(standby) LED is illuminated on the second TCC2/TCC2P card.
Note
Verify that cross-connect cards (XC-VXL-2.5G, XC-VXL-10G, XC-VXC-10G) are installed in Slots 8
Step 3
and 10. The cross-connect cards must be the same type.
Verify that the green ACT (active) LED is illuminated on one cross-connect card and the amber STBY
Step 4
(standby) LED is illuminated on the second cross-connect card.
Note
If your site plan requires an AIC-I card, verify that the AIC-I card is installed in Slot 9 and its ACT
Step 5
(active) LED displays a solid green light.
Verify that electrical cards (E1-N-14, E1-42, E3-12, DS3I-N-12, or STM1E) are installed in the
Step 6
ONS 15454 SDH slots as designated by your installation plan.
If your site plan requires an Ethernet card, verify that the Ethernet card is installed in the specified slot
Step 7
and its ACT (active) LED displays a solid green light:
Cisco ONS 15454 SDH Procedure Guide, R7.0
4-2
NTP-D326 Provision OSI, page
connected in networks with network elements (NEs) that are based on the Open System
Interconnection (OSI) protocol stack. This procedure provisions the Target Identifier Address
Resolution Protocol (TARP), OSI routers, manual area addresses, subnetwork points of attachment,
and IP-over-OSI tunnels.
This procedure verifies that the ONS 15454 SDH node is ready for turn-up.
An engineering work order, site plan, or other document specifying the
ONS 15454 SDH card installation.
Chapter 1, "Install the Shelf and FMECs"
Chapter 2, "Install Cards and Fiber-Optic Cable"
Required
Onsite
Retrieve or higher
If the TCC2/TCC2P cards are not installed, or if their LEDs are not operating as described, do
not proceed. Repeat the
refer to the Cisco ONS 15454 SDH Troubleshooting Guide to resolve installation problems
before proceeding to
Step
If the cross-connect cards are not installed, or if their LEDs are not illuminated as described, do
not proceed. Repeat the
XC-VXC-10G Cards" task on page
Troubleshooting Guide to resolve installation problems before proceeding to
The E100T-12, E100T-12-G, E1000-2, E1000-2-G, G1K-4, ML1000-2, ML100T-12, ML-100X-8,
and CE-1000-4 cards are installed in Slots 1 to 6 or 12 to 17.
4-14—Complete this procedure if the ONS 15454 SDH will be
"DLP-D332 Install the TCC2/TCC2P Cards" task on page
3.
"DLP-D333 Install the XC-VXL-10G, XC-VXL-2.5G, or
20-25, or refer to the Cisco ONS 15454 SDH
Chapter 4
Turn Up a Node
20-22, or
Step
5.
78-17194-01

Advertisement

Table of Contents
loading

Table of Contents