Figure 5-1 Linear Adm Configuration - Cisco ONS 15454 SDH Procedure Manual

Hide thumbs Also See for ONS 15454 SDH:
Table of Contents

Advertisement

Chapter 5
Turn Up a Network
NTP-D38 Provision a Linear ADM Network
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
provision a linear ADM network. If you are already logged in, continue with Step 2.
Figure 5-1
traffic flows from Slot 5/Node 1 to Slot 5/Node 2, and from Slot 12/Node 2 to Slot 12/Node 3. Slots 6
and 13 contain the protect STM-N cards. Slots 5 and 6 and Slots 12 and 13 are in 1+1 protection.
Figure 5-1
Node 1
Click the Provisioning > Protection tabs. Verify that 1+1 protection is created for the STM-N cards at
Step 2
the node. If the protection group has not been created, complete the
Group" task on page
Step 3
Repeat Steps
Verify that the working and protect cards in the 1+1 protection groups correspond to the physical fiber
Step 4
connections between the nodes, that is, working cards are fibered to working cards and protect cards are
fibered to protect cards.
Step 5
Complete the
the working STM-N ports on each linear ADM node. Alternatively, if additional bandwidth is needed
for CTC management, complete the
on page
Note
78-17194-01
This procedure provisions three or more ONS 15454 SDHs in a linear
ADM configuration.
None
NTP-D35 Verify Node Turn-Up, page 5-2
As needed
Onsite
Provisioning or higher
"DLP-D60 Log into CTC" task on page 17-49
shows three ONS 15454 SDHs in a linear ADM configuration. In this example, working
Linear ADM Configuration
Slot 5 to Slot 5
Slot 6 to Slot 6
17-64.
1
and
2
for all other nodes that you will include in the linear ADM.
"DLP-D363 Provision Regenerator-Section DCC Terminations" task on page 20-68
20-71.
If linear ADM nodes are not connected to a LAN, you will need to create the DCC terminations
using a direct (craft) connection to the node. Remote provisioning is possible only after all nodes
without LAN connections have DCC terminations provisioned to Unlocked-enabled STM-N
ports.
at an ONS 15454 SDH where you want to
Slot 12 to Slot 12
Slot 13 to Slot 13
Node 2
"DLP-D364 Provision Multiplex-Section DCC Terminations" task
Cisco ONS 15454 SDH Procedure Guide, R7.0
NTP- D38 Provision a Linear ADM Network
Node 3
Protect Path
Working Path
"DLP-D73 Create a 1+1 Protection
for
5-7

Advertisement

Table of Contents
loading

Table of Contents