Dlp- D40 Create A Provisionable Patchcord - Cisco ONS 15454 SDH Procedure Manual

Hide thumbs Also See for ONS 15454 SDH:
Table of Contents

Advertisement

Chapter 17
DLPs D1 to D99
Verify the LED activity:
Step 4
Return to your originating procedure (NTP).
Step 5
DLP-D40 Create a Provisionable Patchcord
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Note
To set up a provisionable patchcord between an optical port and a transponder/muxponder, an add/drop
multiplexer, or multiplexer/demultiplexer port, the optical port must have a DCC termination
provisioned. If the port is the protection port in a 1+1 group, the working port must have a DCC
termination provisioned. As needed, complete the
Terminations" task on page 20-68
on page
An optical port requires two patchcords when the remote end is Y-cable protected or is an add/drop
Note
multiplexer or multiplexer/demultiplexer port.
78-17194-01
The red FAIL LED turns on for 20 to 30 seconds.
The red FAIL LED blinks for 35 to 45 seconds.
All LEDs blink once and turn off for 1 to 5 seconds.
The ACT or ACT/STBY LED turns on. The SF LED can persist until all card ports connect to their
far end counterparts and a signal is present.
If the red FAIL LED does not turn on, check the power.
Note
If you insert a card into a slot provisioned for a different card, all LEDs turn off.
Note
This task creates a provisionable patchcord, also called a virtual link.
Patchcords are used for network communication when a DCC/generic
communications channel (GCC) is not available. They appear as dashed
lines in CTC network view.
For the specific situations in which a patchcord is necessary, refer to the
Cisco ONS 15454 SDH Reference Manual.
STM-N, transponder/muxponder, optical add/drop multiplexer, and
multiplexer/demultiplexer cards
For the card combinations that support patchcords, refer to the
Cisco ONS 15454 SDH Reference Manual.
DLP-D60 Log into CTC, page 17-49
As needed
Onsite or remote
Provisioning and higher
20-71.
"DLP-D363 Provision Regenerator-Section DCC
or
"DLP-D364 Provision Multiplex-Section DCC Terminations" task
Cisco ONS 15454 SDH Procedure Guide, R7.0

DLP- D40 Create a Provisionable Patchcord

17-31

Advertisement

Table of Contents
loading

Table of Contents