NTP- D105 Add an SNCP Node
NTP-D105 Add an SNCP Node
Purpose
Tools/Equipment
Prerequisite Procedures Cards must be installed and node turn-up procedures completed on the
Required/As Needed
Onsite/Remote
Security Level
According to local site practice, complete the
Step 1
page 15-5
Log into an existing node in the SNCP where you want to add a node. See the
Step 2
task on page 17-49
must be an authorized user on the node and you must have IP connectivity to the node.
Step 3
Complete the
that the SNCP is free of major alarms or problems. If trouble is indicated (for example, a major alarm
exists), resolve the problem before proceeding. See
to the Cisco ONS 15454 SDH Troubleshooting Guide.
Count the total number of circuits on the fiber that is cut between the existing nodes. To count the number
Step 4
of circuits, right click on the fiber that is cut, and click circuits.
In network view, click the Circuits tab.
Step 5
To view Partial circuits, click the Filter button and select PARTIAL from the Status drop-down list.
The Partial circuits, if any, are displayed.
To view Partial_TL1 circuits, click the Filter button and select PARTIAL_TL1 from the Status
drop-down list. The Partial_TL1 circuits, if any, are displayed.
Resolve any partial circuits (both Partial and Partial_TL1) in the network before proceeding. However,
if you want to continue with
before and after adding a path protection node. This ensures that no additional partial circuits are created
after this procedure is completed.
Verify the card installation on the new node. See the
Step 6
page
optical rate of the trunk cards to which the new node will be connected. For example, if the adjacent
nodes have STM-16 trunk cards, the new node must have STM-16 cards installed. If the STM-N cards
are not installed or the rate does not match the rate of the adjacent node trunk cards, complete the
"NTP-D16 Install STM-N Cards and Connectors" procedure on page 2-7
Step 7
Verify that fiber is available to connect the new node to the existing nodes.
Step 8
Complete the
Step 9
Determine if the following conditions are present.
Cisco ONS 15454 SDH Procedure Guide, R7.0
14-10
This procedure adds a node to an SNCP ring.
None
node that will be added to the SNCP ring. See
Fiber-Optic Cable,"
As needed
Onsite
Superuser
for all the nodes in the ring.
for instructions. In order to have CTC visibility to the new node after it is added, you
"DLP-D298 Check the Network for Alarms and Conditions" task on page 19-83
Step
4-2. Check that the STM-N cards that will serve as the SNCP trunk (span) cards match the SNCP
"NTP-D35 Verify Node Turn-Up" procedure on page
The IP address for the new node is on the same subnet as other nodes in the network.
On the new node Provisioning > Network > General tab, Craft Access Only is not checked under
Gateway Settings.
A CTC computer is directly connected to the new node.
and
Chapter 4, "Turn Up a Node."
"NTP-D108 Back Up the Database" procedure on
Chapter 9, "Manage Alarms"
6, match the number of partial circuits and circuit names that existed
"NTP-D24 Verify Card Installation" procedure on
Chapter 14
Add and Remove Nodes
Chapter 2, "Install Cards and
"DLP-D60 Log into CTC"
or, if necessary, refer
to install them.
5-2.
78-17194-01
to verify

Advertisement

Table of Contents
loading

Table of Contents