Ntp- D47 Subtend An Ms-Spring From An Sncp - Cisco ONS 15454 SDH Procedure Manual

Hide thumbs Also See for ONS 15454 SDH:
Table of Contents

Advertisement

NTP- D47 Subtend an MS-SPRing from an SNCP

As needed, complete the
Step 7
As needed, complete the
Step 8
From the View menu, choose Go To Network View to view the subtending rings.
Step 10
Complete the
Step 11
NTP-D47 Subtend an MS-SPRing from an SNCP
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
In the SNCP node that will subtend the MS-SPRing, install the two STM-N cards that will serve as the
MS-SPRing trunk (span) cards (in
STM-N Cards and Connectors" procedure on page
Attach fibers from the cards in
Step 2
nodes. In
1/Slot 5. See the
page
Log into the ONS 15454 SDH that will subtend the MS-SPRing (the node in Step 1). See the
Step 3
Log into CTC" task on page
Create the DCCs on both STM-N trunk cards (east and west) that will carry the MS-SPRing. See the
Step 4
"DLP-D363 Provision Regenerator-Section DCC Terminations" task on page
additional bandwidth is needed for CTC management, complete the
Multiplex-Section DCC Terminations" task on page
Create the subtending MS-SPRing:
Step 5
a.
b.
From the View menu, choose Go to the Network View to see the subtending ring.
Step 6
Cisco ONS 15454 SDH Procedure Guide, R7.0
5-40
"DLP-D81 Provision a Proxy Tunnel" task on page
"DLP-D90 Provision a Firewall Tunnel" task on page
for each node in the SNCP.
"NTP-D343 SNCP Acceptance Test" procedure on page
This procedure subtends an MS-SPRing from an existing SNCP ring.
One SNCP node must have STM-N cards and fibers to carry the
MS-SPRing.
NTP-D44 Provision SNCP Nodes, page 5-22
Onsite
Figure
5-12, Node 3/Slot 5 connects to Node 2/Slot 12, and Node 3/Slot 12 connects to Node
"DLP-D338 Install Fiber-Optic Cables for MS-SPRing Configurations" task on
20-37.
17-49. If you are already logged in, continue with Step 4.
Complete the
"NTP-D40 Provision MS-SPRing Nodes" procedure on page 5-10
will be in the MS-SPRing. If you have already provisioned the MS-SPRing, perform this procedure
for the subtending node only.
Complete the
"NTP-D41 Create the MS-SPRing" procedure on page
(the node that will subtend the MS-SPRing) in the MS-SPRing.
Figure
5-12, Node 3, Slots 5 and 12). See the
2-7.
to the MS-SPRing trunk cards on another MS-SPRing node or
20-71.
Chapter 5
Turn Up a Network
17-73.
17-83.
5-24.
"NTP-D16 Install
"DLP-D60
20-68. Alternatively, if
"DLP-D364 Provision
for each node that
5-13. Include the node in
78-17194-01

Advertisement

Table of Contents
loading

Table of Contents