Turn Up a Network
This chapter explains how to turn up and test Cisco ONS 15454 SDH networks, including point-to-point
networks, linear add/drop multiplexers (ADMs), subnetwork connection protection rings (SNCPs), and
multiplex section-shared protection rings (MS-SPRings).
Before You Begin
This section lists the chapter procedures (NTPs). Turn to a procedure for applicable tasks (DLPs).
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
78-17194-01
NTP-D35 Verify Node Turn-Up, page
turn-up.
NTP-D124 Provision a Point-to-Point Network, page
NTP-D339 Point-to-Point Network Acceptance Test, page
create a point-to-point network.
NTP-D38 Provision a Linear ADM Network, page
NTP-D340 Linear ADM Network Acceptance Test, page
create a linear ADM.
NTP-D40 Provision MS-SPRing Nodes, page
ONS 15454 SDHs in a two-fiber or four-fiber MS-SPRing.
NTP-D41 Create the MS-SPRing, page
MS-SPRing nodes.
NTP-D341 Two-Fiber MS-SPRing Acceptance Test, page
create a two-fiber MS-SPRing.
NTP-D342 Four-Fiber MS-SPRing Acceptance Test, page
create a four-fiber MS-SPRing.
NTP-D304 Provision a Traditional MS-SPRing Dual-Ring Interconnect, page
complete this procedure after you provision a MS-SPRing.
NTP-D305 Provision an Integrated MS-SPRing Dual-Ring Interconnect, page
complete this procedure after you provision a MS-SPRing.
NTP-D44 Provision SNCP Nodes, page
NTP-D343 SNCP Acceptance Test, page
ring.
NTP-D217 Provision a Traditional SNCP Dual-Ring Interconnect, page
this procedure after you provision an SNCP ring.
C H A P T E R
5-2—Complete this procedure before beginning network
5-3—Complete as needed.
5-4—Complete this procedure after you
5-7—Complete as needed.
5-8—Complete this procedure after you
5-10—Complete this procedure to provision
5-13—Complete this procedure after provisioning the
5-14—Complete this procedure after you
5-16—Complete this procedure after you
5-22—Complete as needed.
5-24—Complete this procedure after you create an SNCP
Cisco ONS 15454 SDH Procedure Guide, R7.0
5
5-18—As needed,
5-21—As needed,
5-26—As needed, complete