DLP-D17 Connect Office Power to the ONS 15454 SDH Shelf
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
When installing or replacing the unit, the ground connection must always be made first and
Warning
disconnected last. Statement 1046
Caution
Do not apply power to the ONS 15454 SDH until you complete all installation steps and check the
continuity of the –48 VDC battery and battery return.
No more than 2 m (7 ft) of the power supply cable should be exposed between the equipment and the
Note
cable-management tray.
If you encounter problems with the power supply, refer to the "General Troubleshooting" chapter in the
Note
Cisco ONS 15454 SDH Troubleshooting Guide for possible causes.
Only use listed compression-type connectors when terminating the battery, battery return, and ground
Note
conductors. Connectors must be suitable for copper conductors.
78-17194-01

DLP- D17 Connect Office Power to the ONS 15454 SDH Shelf

This task connects power to the ONS 15454 SDH shelf.
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Wire wrapper
Wire cutters
Wire strippers
Crimp tool
Fuse panel
Power cable (from fuse and alarm panel to assembly), 8.36-mm² (#8 AWG),
copper conductors, 194 degrees F [90 degrees C])
Ground cable 13.3-mm² (#6 AWG) stranded
Listed pressure terminal connectors such as ring and fork types; connectors
must be suitable for 8.36-mm² (#8 AWG) copper conductors
DLP-D16 Connect the Office Ground to the ONS 15454 SDH, page 17-13
Required
Onsite
None