Ntp- D305 Provision An Integrated Ms-Spring Dual-Ring Interconnect - Cisco ONS 15454 SDH Procedure Manual

Hide thumbs Also See for ONS 15454 SDH:
Table of Contents

Advertisement

Chapter 5
Turn Up a Network
NTP-D305 Provision an Integrated MS-SPRing Dual-Ring
Interconnect
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
If you are already logged in, continue with Step 2.
Complete the following steps if you have not provisioned the MS-SPRings that you will interconnect in
Step 2
an MS-SPRing DRI. If the MS-SPRings are created, go to Step 3.
a.
b.
c.
d.
Step 3
Verify that the MS-SPRing DRI interconnect node has STM-N cards installed and has fiber connections
to the other interconnect node:
78-17194-01
This procedure provisions MS-SPRings in an integrated DRI topology.
None
NTP-D35 Verify Node Turn-Up, page 5-2
As needed
Onsite
Provisioning or higher
"DLP-D60 Log into CTC" task on page 17-49
Complete the
"NTP-D40 Provision MS-SPRing Nodes" procedure on page 5-10
MS-SPRings.
Complete the
"NTP-D41 Create the MS-SPRing" procedure on page 5-13
MS-SPRings.
Complete the
"NTP-D341 Two-Fiber MS-SPRing Acceptance Test" procedure on page 5-14
two-fiber MS-SPRings.
Complete the
"NTP-D342 Four-Fiber MS-SPRing Acceptance Test" procedure on page 5-16
four-fiber MS-SPRings.
The STM-N cards that will connect the MS-SPRings must be installed at the two interconnect nodes.
The two interconnect nodes must have the correct fiber connections.
of an integrated two-fiber MS-SPRing DRI configuration.

NTP- D305 Provision an Integrated MS-SPRing Dual-Ring Interconnect

at a node in the MS-SPRing DRI network.
Cisco ONS 15454 SDH Procedure Guide, R7.0
to provision the
to create the
to test
to test
Figure 5-5
shows an example
5-21

Advertisement

Table of Contents
loading

Table of Contents