Ntp- D85 Change Node Timing - Cisco ONS 15454 SDH Procedure Manual

Hide thumbs Also See for ONS 15454 SDH:
Table of Contents

Advertisement

NTP- D85 Change Node Timing

Click the Provisioning > Comm Channels tabs.
Step 2
Complete the following tasks to modify communication channel terminations, as needed:
Step 3
Complete the following tasks to delete communication channel terminations, as needed:
Step 4
As needed, complete the
Step 5
Stop. You have completed this procedure.
NTP-D85 Change Node Timing
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
Step 2.
Complete the
Step 2
As needed, complete the
Step 3
If you need to change any internal timing settings, complete the
Step 4
on page 17-61
Internal timing is Stratum 3 and not intended for permanent use. All ONS 15454 SDHs should be timed
Caution
to a Stratum 2 or better primary reference source.
If you need to verify timing after removing a node from an multiplex section-shared protection ring
Step 5
(MS-SPRing) or subnet connection protection (SNCP) ring, see the
Reduced Ring" task on page
Complete the
Step 6
Stop. You have completed this procedure.
Cisco ONS 15454 SDH Procedure Guide, R7.0
11-6
DLP-D359 Change a Regenerator-Section DCC Termination, page
DLP-D358 Change a Multiplex-Section DCC Termination, page
DLP-D360 Delete a Regenerator-Section DCC Termination, page 20-66
DLP-D362 Delete a Multiplex-Section DCC Termination, page 20-68
"DLP-D41 Delete a Provisionable Patchcord" task on page
This procedure changes the SDH timing settings for the ONS 15454 SDH.
None
NTP-D28 Set Up Timing, page 4-9
As needed
Onsite or remote
Provisioning or higher
"DLP-D60 Log into CTC" task on page
"NTP-D108 Back Up the Database" procedure on page
"DLP-D157 Change the Node Timing Source" task on page
for the settings you need to modify.
18-82.
"NTP-D108 Back Up the Database" procedure on page
Chapter 11
20-65.
20-65.
17-49. If you are already logged in, continue with
15-5.
"DLP-D70 Set Up Internal Timing" task
"DLP-D195 Verify Timing in a
15-5.
Change Node Settings
17-33.
18-48.
78-17194-01

Advertisement

Table of Contents
loading

Table of Contents