MANUAL TRANSMISSION
–
10. INSTALL SYNCHRONIZER RING AND GEAR SPLINE
PIECE NO.5
(a) Install the synchronizer ring on gear spline piece
No. 5.
(b) Using SST and a hammer, drive in gear spline piece
No. 5 with the synchronizer ring slots aligned with
the shifting keys.
SST 09316–60010 (09316–00010)
HINT: When installing gear spline piece No.5, support
the counter gear in front with a 3–5 Ib hammer or equiva–
lent.
11. INSTALL LOCK NUT
(a) Engage the gear double meshing.
(b) Install and torque the lock nut.
Torque: 127 N–m (1, 300 kgf–cm, 94 ft–lbf )
(c) Stake the lock nut.
(d) Disengage the gear double meshing.
12. INSPECT COUNTER FIFTH GEAR THRUST CLEARANCE
Using a feeler gauge, measure the counter 5th gear
thrust clearance.
Standard clearance: 0.10 – 0.35 mm
Assembly of Transmission
(0.0039 – 0.0138 in.)
MT1–97