Switches, I/F, Others; Cross-Section View - Canon imageRUNNER ADVANCE 6075 Series Service Manual

Table of Contents

Advertisement

1
Product Overview > External View/Internal View > Cross-Section View

■ Switches, I/F, Others

Environment
Heater Switch
Cassette
Heater Switch
Leakage Breaker
Be sure to perform the following procedure for checking the Leakage Breaker.
1) Turn OFF the main power switch and check that the Control Panel LED is off.
2) Using a pen point, press the test button of the breaker on the rear side of the machine.
3) Check that the breaker switch is OFF (O side).
4) Return the breaker switch to ON (I side).
5) Turn ON the main power switch.
1
Product Overview > External View/Internal View > Cross-Section View

Cross-Section View

Reverse Delivery Unit
Main Power Switch
Duplex Feed Unit
F-1-15
Drum Cleaning Unit
Pre-exposure
LED
ETB Unit
(Transfer Belt Unit)
Fixing Assembly
Left Deck
Cassette 3
Cassette 4
1-26
Primary
Charging Assembly
Laser Scanner
Unit
Multi-purpose
Tray Pickup Unit
Developing Assembly
Pre-transfer
Charging Assembly
Transfer Cleaning
Unit
Pickup Paper
Path Unit
Right Deck
F-1-16
1-26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents