7B-26 GENERAL HVAC SYSTEM
3. Remove the compressor pulley.
•
Remove the snap ring using the ring plier.
•
Remove the compressor pulley using the special
tool.
YAD7B540
4. Remove the clutch coil.
•
Mark the location of the clutch coil connector at
the clutch housing.
•
Remove the clutch coil using the special tool.
YAD7B550
5. Assembly should follow the disassembly
procedure in the reverse order.
YAD7B560
SSANGYONG Y200