SSANGYONG Rexton Y200 Manual page 1505

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

9C-36 BODY EXTERIOR
Adjust Up and Down
1. Door of tail gate keep on the one line around parts.
2. Back door keep closing until door lock fork of tail
gate into contacting to striker.
3. After door is set on position of opening, to keep
contact fork of door lock with striker, open and
close the door repeatedly.
YAD9C0K0
4. Technician can see and keep fork of door lock
alignment with striker, fork of door lock is linking
perpendicular to center of striker, is linking center
of body pillar.
YAD9C0L0
5. As striker is required for adjusting to up and down,
proceed to repair, following the descriptions.
1) Release fixing bolt of striker.
2) If striker move to upward, put addition spacer
(2 mm).
3) Tighten fixing bolt of striker.
Torque of Tightening
YAD9C0M0
Adjust Flip Up
1. After removing the upper garnish, release little bit
mounting bolt of flip up glass.
YAD9C0N0
10 - 14 N•m
(44 - 52 lb-ft)
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents

Save PDF