SSANGYONG Rexton Y200 Manual page 1521

Hide thumbs Also See for Rexton Y200:
Table of Contents

Advertisement

9C-52 BODY EXTERIOR
5. Spread primer on the glass of tail gate.
Mix up primer.
Due to excessive spreading, keep eye on
overflowing spreading other section.
Available hour for spreading primer to the
vehicle: after 3hour.
Sealant is not available, if sealant has
sludgematerial.
If available date of sealant is passed, this
sealant is throwing away. available date of
sealant is 90 day for use.
After using gauze 20 times, gauze is thrown
away.
Spread uniformly primer on the surface of glass.
YAD9C2R0
6. Spread sealant on the glass.
Spread sealant point (200 mm) of lower section
of right, like right picture.
If shape of spreading, thickness is not uniform,
leaking of water may occur.
YAD9C2S0
7. After spreading sealant, using compressor, install
glass of tail gate within 5 minutes.
After install glass, tape tail gate, two the point
of glass and one point of the section of arm
side.
YAD9C2T0
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents