4 Maintenance

4.1 Introduction

Structure of this chapter
This chapter describes all the maintenance activities recommended for the CRB
15000.
It is based on the maintenance schedule found at the beginning of the chapter.
The schedule contains information about required maintenance activities including
intervals, and refers to procedures for the activities.
Each procedure contains all the information required to perform the activity,
including required tools and materials.
The procedures are gathered in different sections and divided according to the
maintenance activity.
Safety information
Observe all safety information before conducting any service work.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
work.
The maintenance must be done by qualified personnel in accordance with the
safety requirements set forth in the applicable national and regional standards and
regulations.
Product manual - CRB 15000
3HAC077389-001 Revision: E
Note
If the CRB 15000 is connected to power, always make sure that the CRB 15000
is connected to protective earth and a residual current device (RCD) before
starting any maintenance work.
For more information see:
Product manual - OmniCore C30
Robot cabling and connection points on page
© Copyright 20212022 ABB. All rights reserved.
Safety on page 15
before performing any service
69.