5 Repair
5.6.4 Replacing the axis-4 joint unit
5.6.4 Replacing the axis-4 joint unit
Location of the axis-4 joint unit
The joint unit is located as shown in the figure.
xx2000002119
Summary of the replacement procedure
This is a brief summary of the replacement procedure, containing the major actions
to be performed.
Continues on next page
624
1 Separate the cabling between the housing and the tubular (at the axis-3 joint
unit).
2 Remove the tubular and place on a workbench.
3 Remove the axis-4 cover.
4 Replace the joint unit. Move the cabling from old to new joint unit.
© Copyright 20212022 ABB. All rights reserved.
Product manual - CRB 15000
3HAC077389-001 Revision: E