5 Repair
5.6.5 Replacing the axis-5 joint unit and the axis-5 to axis-6 transition cabling
Continued
5
6
7
Connecting the tilt cabling
1
2
Continues on next page
692
Action
Secure the tilt to the tubular with all attachment
screws but two.
Pre-tighten the screws crosswise firstly.
Remove the guide pins and fasten the remaining
two screws.
Torque tighten all screws crosswise.
Action
Insert the cabling into the tubular.
Reconnect the connectors to the drive board.
•
D3/4.X2 to X2
•
D3/4.DC- to Ground
•
D3/4.DC+ to +DC
© Copyright 20212022 ABB. All rights reserved.
Note
Flange socket head screw: M3x20
12.9 Lafre 2C2B/FC6.9+PrO-
COat111 (14 pcs)
xx2000002130
Flange socket head screw: M3x20
12.9 Lafre 2C2B/FC6.9+PrO-
COat111 (2 pcs)
xx2000002128
Tightening torque: 1.8 Nm.
Note
xx2000002148
xx2000002125
Product manual - CRB 15000
3HAC077389-001 Revision: E