ABB CRB 15000 Product Manual page 686

Hide thumbs Also See for CRB 15000:
Table of Contents

Advertisement

5 Repair
5.6.5 Replacing the axis-5 joint unit and the axis-5 to axis-6 transition cabling
Continued
2
3
4
Continues on next page
686
Action
Connect the connectors to each other and snap
them to the cable holders.
J7.CS to J7.CS
J7.CP to J7.CP
Secure the cables for functional earth and protect-
ive earth with a screw.
Secure the cabling with cable ties.
© Copyright 20212022 ABB. All rights reserved.
Note
xx2000002163
Hex socket head cap screw: M3x6
(1 pcs).
Tightening torque: 0.8 Nm.
xx2000002162
Cable ties (3 pcs)
xx2000002161
Product manual - CRB 15000
3HAC077389-001 Revision: E

Advertisement

Table of Contents
loading

Table of Contents