ABB CRB 15000 Product Manual page 261

Hide thumbs Also See for CRB 15000:
Table of Contents

Advertisement

8
Refitting the joint cabling
Use these procedures to refit the joint-4 cabling.
Refitting the joint cable
1
2
3
Product manual - CRB 15000
3HAC077389-001 Revision: E
Action
Remove the joint cable from the hollow shaft from
the torque sensor side.
CAUTION
The connectors and the joint unit cables are
sensitive to mechanical damage. Handle the as-
sembly with care.
Action
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit read the safety information in section
unit is sensitive to ESD on page
Place the joint cable through the hollow shaft from
the torque sensor side.
CAUTION
The connectors and the joint unit cables are
sensitive to mechanical damage. Handle the as-
sembly with care.
Orient the cable plate according to the figure.
The circle on the cable plate should point towards
the guide pin on the torque sensor.
© Copyright 20212022 ABB. All rights reserved.
5.3.5 Replacing the axis-4 cabling
Note
xx2000002060
Note
The
44.
xx2000002048
xx2000002051
5 Repair
Continued
Continues on next page
261

Advertisement

Table of Contents
loading

Table of Contents