Table 69: Site Preparation Checklist - Juniper QFabric QFX3000-G Hardware Documentation

Hide thumbs Also See for QFabric QFX3000-G:
Table of Contents

Advertisement

QFX3000-G QFabric System Hardware Documentation
Table 68: Site Preparation Checklist (continued)
Item or Task
Plan the cable routing and management.
Related
Documentation
Site Preparation Checklist for EX4200 Switches

Table 69: Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches you
want to install.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
216
For More Information
General Safety Guidelines and Warnings on page 329
Mounting an EX4300 Switch
The checklist in
Table 65 on page 211
preparing a site for EX4200 switch installation.
For More Information
"Environmental Requirements and
Specifications for EX Series Switches"
on page 223
"Power Specifications for EX4200
Switches" on page 311
"EX4200 Switches Hardware
Overview" on page 183
Rack Requirements
Cabinet Requirements
"Clearance Requirements for Airflow
and Hardware Maintenance for
EX4200 Switches" on page 254
Performed by
summarizes the tasks you need to perform when
Performed by
Copyright © 2018, Juniper Networks, Inc.
Date
Date

Advertisement

Table of Contents
loading

Table of Contents