Table 66: Site Preparation Checklist - Juniper QFabric QFX3000-G Hardware Documentation

Hide thumbs Also See for QFabric QFX3000-G:
Table of Contents

Advertisement

Table 66: Site Preparation Checklist (continued)
Item or Task
Power
Measure distance between external power
sources and device installation site.
Calculate the power consumption and
requirements.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the switch.
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
Related
Documentation
Site Preparation Checklist for a QFX3500 Device
Copyright © 2018, Juniper Networks, Inc.
For More Information
"AC Power Specifications for a QFX3600
or QFX3600-I Device" on page 295
"DC Power Specifications for a QFX3600
or QFX3600-I Device" on page 297
"Rack Requirements for a QFX3600 or
QFX3600-I Device" on page 233
"Cabinet Requirements for a QFX3600
or QFX3600-I Device" on page 241
"Clearance Requirements for Airflow and
Hardware Maintenance for a QFX3600
or QFX3600-I Device" on page 249
Determining Interface Support for the
QFX3600 Device
"Determining Transceiver Support for
QFabric Systems" on page 258
General Safety Guidelines and Warnings on page 329
General Site Guidelines on page 217
Installing and Connecting a QFX3600 or QFX3600-I Device on page 453
The checklist in
Table 65 on page 211
preparing a site for QFX3500 device installation.
Performed By
summarizes the tasks you need to perform when
Chapter 9: Site Preparation
Date
213