Figure 129: Airflow Through The Qfx3100 Director Device - Juniper QFabric QFX3000-G Hardware Documentation

Hide thumbs Also See for QFabric QFX3000-G:
Table of Contents

Advertisement

QFX3000-G QFabric System Hardware Documentation
Related
Documentation
Clearance Requirements for Airflow and Hardware Maintenance for a QFX3008-I
Interconnect Device
246
Leave at least 24 in. (61 cm) both in front of and behind the QFX3100 Director device.
For service personnel to remove and install hardware components, you must leave
adequate space at the front and back of the QFX3100 Director device. NEBS GR-63
recommends that you allow at least 30 in. (76.2 cm) in front of the rack or cabinet and
24 in. (61 cm) behind the rack or cabinet.

Figure 129: Airflow Through the QFX3100 Director Device

Front
Cooling System and Airflow in a QFX3100 Director Device on page 31
When planning the site for installing a QFX3008-I Interconnect device, you must allow
sufficient clearance around the device.
Follow these clearance requirements:
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Do not block the air intake or exhaust areas shown in
and
Figure 131 on page
247.
The air intake to cool the front card cage and powerhouse is located below the front
fan tray on the chassis. Hot air exhausts from the powerhouse at the bottom of the
chassis, and above the rear fan tray at the top of the chassis.
Rear
Fan 3
Fan 2
Fan 1
Figure 130 on page 247
Copyright © 2018, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents