Juniper QFabric QFX3000-G Hardware Documentation page 428

Hide thumbs Also See for QFabric QFX3000-G:
Table of Contents

Advertisement

QFX3000-G QFabric System Hardware Documentation
Unpacking a QFX3100 Director Device
378
The QFX3100 Director devices are shipped in a cardboard carton, secured with foam
packing material. The carton also contains an accessory box and quick start instructions.
CAUTION:
QFX3100 Director devices are maximally protected inside the
shipping carton. Do not unpack the Director devices until you are ready to
begin installation.
To unpack a QFX3100 Director device (see
Move the shipping carton to a staging area as close to the installation site as possible
1.
but where you have enough room to remove the system components.
Position the carton so that the arrows are pointing up.
2.
Open the top flaps on the shipping carton.
3.
Remove the accessory box and verify the contents against the parts inventory.
4.
Pull out the packing material holding the QFX3100 Director device in place.
5.
Verify the components received against the inventory provided in
6.
Save the shipping carton and packing materials in case you need to move or ship the
7.
device later.
Figure 147 on page
379):
Table 130 on page
Copyright © 2018, Juniper Networks, Inc.
379.

Advertisement

Table of Contents
loading

Table of Contents