Table 64: Site Preparation Checklist for a QFX3008-I Interconnect Device (continued)
Item or Task
Plan the cable routing and management.
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Ensure that the distance between hardware
components to be connected allows for cable
lengths to be within the specified maximum
limits.
Related
Documentation
Site Preparation Checklist for a QFX5100 Device
Table 65: Site Preparation Checklist
Item or Task
Architecture
Determine whether the QFX5100 device will
operate:
standalone
as a member in a Virtual Chassis
as a spine or leaf in a Virtual Chassis
Fabric (VCF)
as a node in a QFabric
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
Power
Measure the distance between external
power sources and switch installation site.
Calculate the power consumption and
requirements.
Rack or Cabinet
Copyright © 2018, Juniper Networks, Inc.
For More Information
General Safety Guidelines and Warnings on page 329
Installing and Connecting a QFX3008-I Interconnect Device on page 389
The checklist in
Table 65 on page 211
preparing a site for QFX5100 deviceinstallation.
For More Information
Planning a Virtual Chassis Fabric
Deployment
Planning a QFX3000-G QFabric
System Deployment on page 204
Planning a QFX3000-M QFabric
System Deployment
"Environmental Requirements and
Specifications for a QFX5100 Device" on
page 222
"AC Power Specifications for a QFX5100
Device" on page 291
summarizes the tasks you need to perform when