Juniper QFabric QFX3000-G Hardware Documentation page 487

Hide thumbs Also See for QFabric QFX3000-G:
Table of Contents

Advertisement

Four-Post Procedure
Copyright © 2018, Juniper Networks, Inc.
Twenty-four screws for QFX5100-96S
Eight screws to secure the chassis and rear installation blades to the rack (not
provided).
For two-post installations (QFX5100-96S only):
One QFX5100-96S 2-post rack mount kit (separately orderable).
Sixteen screens for attaching the brackets to the chassis (provided).
Eight screws to secure the mounting brackets and chassis to the post (not
provided).
Appropriate screwdriver for the mounting screws (not provided).
Two power cords with plugs appropriate to your geographical location (provided).
RJ-45 cable and RJ-45 to DB-9 serial port adapter (provided).
Management host, such as a PC laptop, with a serial port (not provided).
Optional equipment: Grounding cable kit with bracket, lug, and three nuts with integrated
washers.
WARNING:
The 1 U versions of QFX5100 switches must be supported at all
four corners. Mounting the chassis using only the front brackets will damage
the chassis and can result in serious bodily injury.
CAUTION:
All QFX5100 switches require two people for installation, one
person to lift the switch into place and another person to attach the switch
to the rack. If you are installing the QFX5100 switch above 60 in. (152.4 cm)
from the floor, you can remove the power supplies and fan modules to
minimize the weight before attempting to install the switch.
CAUTION:
If you are mounting multiple switches on a rack, mount the switch
in the lowest position of the rack first. Proceed to mount the rest of the
switches from the bottom to the top of the rack to minimize the risk of the
rack toppling.
To mount the switch on four posts in a rack using the provided mounting kit:
Attach the ESD grounding strap to your bare wrist and to a site ESD point.
1.
Decide whether the Field Replaceable Unit (FRU) end of the switch or the port end is
2.
to be placed at the front of the rack. Position the switch in such a manner that the
Chapter 31: Installing a QFX5100 Node Device
AIR
437

Advertisement

Table of Contents
loading

Table of Contents