DLP-A530 Install the Tie-Down Bar
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
Align the ends of the tie-down bar with the four screw holes located 1 rack unit (RU) below the
ONS 15454.
Figure 22-9
Figure 22-9
Step 2
Install the four screws into the rack.
Step 3
Return to your originating procedure (NTP).
October 2005
This task installs the tie-down bar used to secure cabling on the rear of the
ONS 15454. The tie-down bar can be used to provide a diverse path for
redundant power feeds and cables.
Tie-down bar
Screws (4)
DLP-A5 Mount the Shelf Assembly in a Rack (One Person), page 17-5
DLP-A6 Mount the Shelf Assembly in a Rack (Two People), page 17-6
As needed
Onsite
None
shows the tie-down bar, the ONS 15454, and the rack.
Tie-Down Bar
DLP-A530 Install the Tie-Down Bar
Tie-down bar
Cisco ONS 15454 Procedure Guide, R5.0
22-27